国产精品亚洲任你操视频,亚洲91成人在线观看,精品欧美日韩一区二区,国产激情视频tv破解版,草莓社区国产专区在线,三级在线观看亚洲无码,久久人人妻人人爽人人爽,国产精品视频网站456,久久国产精品免费观看,037国产一级拍拍视频

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2251

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in